Torquay homes to get safety inspections


NGED teams to inspect equipment in TQ2 properties as part of national safety programme
National Grid Electricity Distribution (NGED) is carrying out safety inspections at properties in Torquay from this week.
Homes and small businesses in the TQ2 postcode – which includes Torre, Upton and Wellswood – will be visited by NGED-approved contractors to inspect electricity service termination points, also known as cut-outs.
The cut-out is where the main electricity cable and fuse enter the property, typically located near the electricity meter or in an outdoor meter cabinet.
Inspectors will carry out a visual check of equipment belonging to NGED and energy suppliers. There will be no disruption to electricity supply and no disassembly of equipment.
The inspections are part of a 20-year rolling programme, with NGED aiming to assess 400,000 properties annually across the Midlands, South West, and South Wales. The checks fulfil an Ofgem licensing requirement to ensure equipment is safe and operating correctly.
Richard Brady, NGED’s policy engineer leading the programme, said: “The UK is recognised internationally as having one of the most resilient and safe energy systems and this inspection programme underlines our commitment to the highest safety standards.
“Inspectors will visually examine cut-outs to check they are working as they should, taking photos and notes for our records. In the unlikely event of a defective cut-out being found, NGED engineers will be sent to carry out repairs at no cost to the customer.
“Visits will also be an opportunity to confirm what types of low-carbon technologies (LCT) are connected to our network, for example electric vehicle chargers and solar panels, to help our planning for future load growth on the network, and enable LCT items to be connected quicker in the future as we will have records of the cut-out asset on site and its condition.
“These are important safety visits but we understand they could be inconvenient for customers and apologise in advance if this is the case.”
The visits will be carried out by staff from Calisen, a contractor working on behalf of NGED. Inspectors will carry official ID and authorisation.
Customers who prefer not to have an in-person visit can submit photographs of their meter and cut-out. NGED will assess whether a follow-up inspection is necessary.